Field note 05 · Cost

Fullerton ADU cost begins with a defined scope.

An online price band cannot see the property, structure, utilities, finish decisions, or City comments. A useful budget separates categories, assumptions, allowances, and unresolved conditions.

01 · Budget structure

Keep unlike costs in separate columns.

Design and engineering

Existing-condition documentation, design, consultant work, energy documentation, and coordination.

City and agency

Application, plan review, permit, impact, utility, and other applicable charges—verified for the actual project.

Utilities and site

Trenching, connections, service capacity, drainage, access, demolition, protection, and restoration.

Construction and finish

Structure, envelope, systems, interiors, fixtures, selections, and documented allowances.

02 · Comparison test

Compare inclusions before totals.

CheckWhat clarity looks like
Scope boundaryIncluded work, exclusions, and owner responsibilities are named.
AllowanceThe item, amount, selection responsibility, and adjustment method are visible.
Site assumptionAccess, soil, utilities, existing conditions, and protection assumptions are stated.
Revision milestoneThe proposal says when drawings, selections, or agency responses will refine the number.

03 · Contingency logic

Unknown is a category—not a promise.

Contingency should respond to the project’s level of documentation and risk. It is not a substitute for investigation, and this site does not provide a project price or financial advice.

City-cost checkpoint

Use Fullerton’s current applications and fee resources for live City information. Ask the applicable departments or utilities about project-specific charges rather than copying an old fee from another property.